Construction Projects (Town of Collingwood, read 18 October 2026). PDF page 1. Town of Collingwood.
This is one passage of about 220 words from a public document. It can start or end in the middle of a sentence. The page number is the PDF's, not the number printed on the page.
reconstruction, including drainage improvements, sanitary sewer replacement and services to the property line, replacement of the existing 100mm diameter watermain with a new 150mm diameter distribution watermain, including fire hydrants and water services to the property line. Installation of a new 400mm diameter transmission watermain for new development in the west side of Collingwood is part of this project as well. Active Transportation facilities were evaluated as part of the design, and one (1) way cycle tracks will be constructed on each side of Sixth Street from Hurontario to High Street. Construction will be in two (2) phases: Phase 1 Hurontario Street to Oak Street, and Phase 2 Oak Street to High Street. Phase 1 construction is scheduled for 2026 and Phase 2 construction will occur in 2027. Reconstruction on Hurontario Street from Hume Street to Sixth Street has been included in the scope and construction for Phase 1. Utility relocations are currently underway and are scheduled to be completed by April 15, 2026. Engage Collingwood: Sixth Street Reconstruction St. Paul Street (Fourth Street to Ontario Street) and Fourth Street East (Ste. Marie Street to Ste. Paul Street) Sanitary Renewal Project This project involved full reconstruction with new sanitary sewer including services to the property line, new watermain upgrades including services to the property line, and drainage improvements within the
construction_projects#p1.9
Prototype. Not an official Town of Collingwood product, and not legal or planning advice. The passage above is an excerpt of a public document. Read the original before you rely on it.