VOTE
THE VISIONThe VisionThe short versionThe galleryThe reports
THE PLANPrioritiesThe first 90 daysHow we pay for itThe hospitalThe new rec centreQuick Action FundWhat a mayor can doThe big projectsLook things upCommunication
WHY JONWhy JonMeet Jon
GET INVOLVEDGet involvedYour voiceDonate
SOURCE PASSAGE

Downtown Plan

Downtown Master Plan (2025). PDF page 14. Town of Collingwood.

This is one passage of about 220 words from a public document. It can start or end in the middle of a sentence. The page number is the PDF's, not the number printed on the page.

Challenges - There is a disconnect between the - As a Heritage Conservation District, Downtown and the waterfront due to there are conflicting opinions on growth the significant traffic on First Street and and height in the Downtown. ‘gaps’ in the public realm approaching the - As with the rest of the Town, there waterfront. is a lack of affordable and/or available - The Downtown is perceived as a car- housing within the Downtown. oriented destination, with vehicle traffic - There is a perception that the creating safety concerns for pedestrians Downtown is uncomfortable and there and cyclists. are specific challenges within and - There is a lack of a formalized and centrally- around the existing bus terminal and located open space in the Downtown to host public washrooms civic events and gathering opportunities. - There is a lack of clear wayfinding - There is a lack of evening programming and signage for pedestrians and cyclists commercial uses to regularly attract visitors when moving throughout the to the Downtown outside of peak times. Downtown. 14 Town of Collingwood

downtown_master_plan_2025#p14.0

Prototype. Not an official Town of Collingwood product, and not legal or planning advice. The passage above is an excerpt of a public document. Read the original before you rely on it.

TELL JONDONATE