SOURCE PASSAGE
OP Adoption
Staff report P2023-32, adoption of the Official Plan. PDF page 6. Town of Collingwood.
This is one passage of about 220 words from a public document. It can start or end in the middle of a sentence. The page number is the PDF's, not the number printed on the page.
change to the classification of Third Street as a collector road must be supported by expert analysis, ideally through the Transportation and Mobility Master Plan (see next Section of this Report on “Transportation”). The 2023 Capital Budget does include funds for the future design of the Third Street Bridge located between Oak and Birch Streets to carry out needed rehabilitation work. The Town’s Capital Plan also has the reconstruction of Third Street from High Street to Birch Street scheduled in 2028. Specific traffic features to address particular issues related to Third Street would be considered during the pre-design for road reconstruction. Any proposed changes to the Third Street road design (i.e. addition of sidewalks on both sides of the street, addition of cycling lanes, on street parking, etc.) would include public consultation. There are various traffic calming measures that can be implemented and will be considered when Third Street is reconstructed in the future. Sidewalks on both sides of the street is
op_adoption_P2023-32#p6.2
Prototype. Not an official Town of Collingwood product, and not legal or planning advice. The passage above is an excerpt of a public document. Read the original before you rely on it.