SOURCE PASSAGE
Servicing Policy
Servicing Capacity Allocation Policy. PDF page 6. Town of Collingwood.
This is one passage of about 220 words from a public document. It can start or end in the middle of a sentence. The page number is the PDF's, not the number printed on the page.
Town of Collingwood Water and Wastewater Capacity Allocation Policy - March 2022 creation of rights-of-ways or easements pursuant to Section 53 of the Planning Act; c) A change on a property from one permitted use to another permitted use in -law that would not result in an increase in water usage and/or sewage flows as confirmed by a professional engineer (if required by the Town) and/or where proposed fixtures and capacity limits do not exceed the water or wastewater capacity flows/allocation of the previous use. For additional clarity, permitted uses are listed in the Zoning By-law, as may be amended under Sections 34 or 39 of the Planning Act; d) The construction of a deck, patio, fence, porch, accessory building or structure, temporary building or structure, or interior or exterior renovation to an existing building; e) The repair, re-build or restoration of a legally existing building or structure, or part thereof, provided that the building or structure continues to be used for the same purpose; and f) Any project previously exempted from the Interim Control By-law No. 2021-024, as amended which has not yet been issued a building permit, for the period of one (1) year from the date this Policy comes into force and effect. A7 TIMING AND EXPIRY OF WATER AND WASTEWATER CAPACITY ALLOCATION A7.1 APPLICABILITY OF THIS
servicing_capacity_policy_SCAP#p6.0
Prototype. Not an official Town of Collingwood product, and not legal or planning advice. The passage above is an excerpt of a public document. Read the original before you rely on it.