Three things in one place: what is being dug up on your street, where the big projects actually stand, and a search of the Town’s own planning papers. Every fact here links back to the page it came from, in the Town’s words, so you can check it yourself.

Read this first. This is my campaign’s tool, not the Town’s, and it is not legal advice. The two “sides” below are meant to be one-sided — that is the point of them. Short summaries can be wrong or out of date. Before you rely on anything here, click through and read the real page it came from.

The sewage plant — the one nobody has studied yet

Everything that goes down a drain in Collingwood ends up here. There is more room left in it than there is in the water plant, but the Town has not yet finished working out whether it can handle the town we are being told to build.

2026today

Point at a dot to see what happened that day. On a phone, use the buttons.

2
2 steps on the public record, all of them recent. Every one is listed below, in the Town’s own words.

Where it stands today

No expansion approved and no study finished. A review of whether the plant can meet future growth was due to begin in the spring of 2026. At the end of 2025 the Town reported room for roughly 4,600 more homes.

  1. 20 April 2026
    A study landed

    A report to council said how much room is left in the sewage plant for new homes.

    about 4,706 cubic metres a day — roughly 4,636 homes

    Show me where it says that
    “the uncommitted hydraulic reserve capacity for the wastewater system is approximately 4,706m3/d (4,636 SDUs).”

    Staff Report IN2026-03, water and wastewater capacity update

  2. Spring 2026
    A study landed

    The Town said the study into whether the sewage plant can cope with future growth would start in the spring.

    Show me where it says that
    “A review of Collingwood's wastewater treatment plant to meet future growth needs is scheduled to commence in Q2 of 2026 through a Class Environmental Assessment (Class EA) process.”

    Staff Report IN2026-03, water and wastewater capacity update

What nobody has published yet

  • Whether the study actually started in the spring of 2026. Nothing published says it did.
  • What expanding the plant would cost, and when it would be needed. No estimate has been published.
  • How the room left in the sewage plant lines up with the much tighter room left in the water plant. The Town reports them separately and does not reconcile them.

Researched from the Town’s own pages and council material on 18 October 2026. Every quote is copied word for word and links to where it is written. This is my campaign’s page, not a Town of Collingwood product, and the record is still moving — check the links before relying on anything here. If I have something wrong, tell me and I will fix it and say that I did.