Sixth Street Reconstruction (Town of Collingwood project page)
PDF page 1
is a Generational project – The new cross-section will look very different and will transform the street into one that we hope will encourage active movement as the preferred means of transportation throughout Town. Why is the Town building a separate bike lane when there is already an on-street b…
Read it yourselfOriginal document
Sixth Street Reconstruction (Town of Collingwood project page)
PDF page 1
improving overall canopy quality and resilience. Project News & Updates May 7, 2026: Temporary Road Closures and Transit Disruptions - Revised As part of the next phase of the Sixth Street Reconstruction Project, a temporary disruption will be in effect starting May 11, 2026. Below are details, including projected timelines, and impacts to transit service. The intersection…
Read it yourselfOriginal document
Housing Needs Assessment (2023)
PDF page 13
Affordability by Ownership Income Deciles As per the PPS, Affordable Ownership Housing is defined as the least expensive of: Housing that is affordable for those below the 6th income decile or housing which is 10% below the average resale home. Bill 23 has revised this to housing which equates to 80% of the average resale home price. As reported by The Lakelands Association of Realtors, the…
Read it yourselfOriginal document
Sixth Street Reconstruction (Town of Collingwood project page)
PDF page 1
at the November 3, 2025, meeting, the Town issued a media release , reaffirming its commitment to the Tree Replacement Strategy on Sixth Street. November 3, 2025: Sixth Street Reconstruction & Tree Replacement Strategy At the November 3, 2025, Council meeting, staff provided an operational update on the tree replacement strategy…
Read it yourselfOriginal document
Sixth Street Reconstruction (Town of Collingwood project page)
PDF page 1
sewer replacement, watermain replacement, streetlights, traffic signals at Hurontario Street/ Sixth Street and Hurontario Street/ Hume Street intersections, Oak Street bridge works, road reconstruction, installation of cycle tracks, and resto…
Read it yourselfOriginal document
Zoning By-law 2010-040 (consolidated November 2025)
PDF page 184
which abuts Poplar Sideroad, Raglan Street or the Sixth Line shall apply: Minimum lot area: 6,000 m2 Minimum lot frontage: 60.0 m The following additional zone provisions shall apply to any lot which abuts Poplar Sideroad, Raglan Street…
Read it yourselfOriginal document
Sixth Street Reconstruction (Town of Collingwood project page)
PDF page 1
will have temporary detours (refer to the map for details). Visit the Transit Page for more information. Blink Route West Route Crosstown East Route The stops at Sixth and Hurontario Streets (Stop #602), and Hurontario and Ste. Marie (Stop #206) will not be serviced during the road closure dates. Image Your anticipated patience is appreciated. Future updates w…
Read it yourselfOriginal document
Construction Projects (Town of Collingwood, read 18 October 2026)
PDF page 1
at the right time, it can extend pavement life by six to eight years or more. Road Sections include: Pretty River South Connell Street Ron Emo Road – Sanford Fleming Drive to Raglan Street Sanford Fleming Drive – Sixth Line to North End Sixth Line - Poplar Sideroad to North End Road Resurfacing Works will include removing exis…
Read it yourselfOriginal document
Zoning By-law 2010-040 (consolidated November 2025)
PDF page 58
m 18.0 m Sixth Street From Sixth Street to north of Tenth Line 26.0 m 13.0 m Mountain Road Determined site From First Street to Poplar specifically by High Street 30.0 m Sideroad Engineering Department From Hu…
Read it yourselfOriginal document
Construction Projects (Town of Collingwood, read 18 October 2026)
PDF page 1
…n the west side of Collingwood is part of this project as well. Active Transportation facilities were evaluated as part of the design, and one (1) way cycle tracks will be constructed on each side of Sixth Street from Hurontario to High Street. Construction will be in two (2) phases: Phase 1 Hurontario Street to Oak Street, and Phase 2 Oak Street to High Street. Phase 1 construction is scheduled f…
Read it yourselfOriginal document
Sixth Street Reconstruction (Town of Collingwood project page)
PDF page 1
Plan passes On June 3, 2024, Council passed a resolution regarding the Sixth Street tree replacement plan. It states: WHEREAS there will be a significant loss of trees in the public right-of-way during the reconstruction of Sixth Street; AND WHEREAS there will be insuffi…
Read it yourselfOriginal document
Zoning By-law 2010-040 (consolidated November 2025)
PDF page 184
Collingwood Zoning By-law • Storage, concealed outside, and • Storage, outside display and sales. A minimum 6.0 m landscape strip is required abutting all street lines except Poplar Sideroad, Raglan Street or the Sixth Line where a 9.0 m strip is required. The landscaping strip may be interrupted by entrances. INDUSTRIAL PARK EXCEPTION TWO – M5-2 ZONE T…
Read it yourselfOriginal document