VOTE
THE VISIONThe VisionThe short versionThe galleryThe reports
THE PLANPrioritiesThe first 90 daysHow we pay for itThe hospitalThe new rec centreQuick Action FundWhat a mayor can doThe big projectsLook things upCommunication
WHY JONWhy JonMeet Jon
GET INVOLVEDGet involvedYour voiceDonate
Keep Collingwood, Collingwood.

READ
THE
PLANS.

Three things in one place: what is being dug up on your street, where the big projects actually stand, and a search of the Town’s own planning papers. Every fact here links back to the page it came from, in the Town’s words, so you can check it yourself.

Read this first. This is my campaign’s tool, not the Town’s, and it is not legal advice. The two “sides” below are meant to be one-sided — that is the point of them. Short summaries can be wrong or out of date. Before you rely on anything here, click through and read the real page it came from.

LOOK IT UP YOURSELF

ON THIS SITE

The water plant: about $270 million, the largest build in the town's history, and the reason there is a limit on new homes.

Where the big projects stand →

That is my own page, in my words. Everything below this is the Town’s wording, quoted and linked.

WHAT THE PAPERS SAY ABOUT “water capacity”
  • “This Water and Wastewater Capacity Allocation Policy ( Allocation Policy ) has been developed to ensure that the remaining and future uncommitted hydraulic reserve capacity in the Raymond A.”

    Servicing Policy, page 2
  • “As such this report has not included the additional water capacity.”

    Servicing Report, page 1

Those sentences are copied word for word out of the documents. Nothing here was written by a computer.

5 DOCUMENTS TO DIVE INTO
Show all 12 matches

Town of Collingwood Official Plan

PDF page 186

…Plan, and shall be consistent with the requirements and guidelines in the Town’s Master Servicing Plan. The Town’s Master Servicing Plan provides requirements and guidelines with respect to: i. Wastewater servicing infrastructure; and ii. Water servicing infrastructure. c) All development shall be provided with full municipal servicing infrastructure, unless otherwise exempted by this Plan. d) Hi…

Read it yourselfOriginal document

Provincial Planning Statement, 2024

PDF page 54

Provincial Planning Statement, 2024 Reserve sewage system capacity: means design Sensitive: in regard to surface water features and or planned capacity in a waste water treatment ground water features, means features that are facility, within municipal sewag…

Read it yourselfOriginal document

Servicing capacity update (IN2026-03)

PDF page 1Excerpt

…be bot protection. URL: https://pub-collingwood.escribemeetings.com/filestream.ashx?DocumentId=9079] Staff Report IN2026-03, Standing Committee 2026-04-08, Council 2026-04-20. Subject: 2025 Year End: Water and Wastewater Uncommitted Hydraulic Reserve Capacity Update. As of December 31, 2025, the uncommitted hydraulic reserve capacity including the safety factor for the drinking water system is app…

Read it yourselfOriginal document

Servicing Capacity Allocation Policy

PDF page 6

which has not yet been issued a building permit, for the period of one (1) year from the date this Policy comes into force and effect. A7 TIMING AND EXPIRY OF WATER AND WASTEWATER CAPACITY ALLOCATION A7.1 APPLICABILITY OF THIS SECTION This section applies to decisions on applications for Draft Plan of Subdivision/Vacant Land Condominium Description Approval…

Read it yourselfOriginal document

BIG QUESTIONS PEOPLE ASK

Three questions
the documents
already answer.

I wrote these three by hand, straight out of the papers — no computer wrote them. The box above searches all 2,158 bits of those papers.

Homes are needed, but is there enough water?

What the Town’s own papers say

  • Collingwood is planned to grow from 25,470 people (2021) to 42,690 by 2051 Official Plan p.44.
  • The Town wants half of all new homes built inside the existing town, not on new land Official Plan p.46.
  • For moderate incomes, affordable rent is about $1,200 to $1,700 a month Housing Needs p.7.1. In 2024 average rent was $2,279 and the average sale price was $837,624 Housing Workplan p.1.
  • At the end of 2025, spare drinking water was about 892 m³/day, or about 670 single homes. Spare wastewater was about 4,636 homes Servicing Report p.1.
  • A plant upgrade is expected to add about 1,391 homes' worth of water, with start-up planned for summer 2026. A study of the wastewater plant was set to start in 2026 Servicing Report p.1.

People who want to build more say

Rents are far above what middle-income families can pay, so we need many more homes, fast. The plan already says growth numbers are a minimum, not a cap Official Plan p.44. Once the water upgrade comes online, put the new capacity toward homes people can afford.

People who want to go slower say

Water is the hard limit. 670 homes of spare water is small next to 17,000 new people. Big approvals without pipes and plants just create waiting lists and broken promises. Safety margins should stay Servicing Report p.1.

A fair way through

Water is the bottleneck. Wastewater is not, at least for now. So use every drop wisely.

  • Residential: When new water capacity opens up, give first place to projects with smaller and lower-cost homes, and to homes inside the existing town. They use less water per family and pipes are already there.
  • Commercial: No change needed.
  • Industrial/Employment: Hold back some water for job-creating businesses, so homes don't use it all.
  • Still unknown: Did the summer 2026 water upgrade actually open on time? (Not in our sources. Check the next capacity report.)

The Build and Protect columns are arguments. The cited sentences above are the part that comes from a document.

ASK A QUESTION

Ask it
like you would
ask a neighbour.

Type a question in your own words. You get three answers: someone arguing to build more, someone arguing to go slower, and then a plain summary of what makes sense — split into homes, shops and jobs. Every fact links back to the page it came from.

One question goes to three readers of the same passages: a case for building, a case for holding back, and a plain-language recommendation. It usually takes under a minute.

WHERE THIS COMES FROM

Where this comes from.

Town of Collingwood, Simcoe County and Province of Ontario public documents. Page numbers are PDF pages, not the number printed on the page. An excerpt is a short capture of a report whose full file could not be downloaded, and the link still goes to the original.

Show all 20 documents
TELL JONDONATE