Three things in one place: what is being dug up on your street, where the big projects actually stand, and a search of the Town’s own planning papers. Every fact here links back to the page it came from, in the Town’s words, so you can check it yourself.

Read this first. This is my campaign’s tool, not the Town’s, and it is not legal advice. The two “sides” below are meant to be one-sided — that is the point of them. Short summaries can be wrong or out of date. Before you rely on anything here, click through and read the real page it came from.

LOOK IT UP YOURSELF

PROJECTS MATCHING “sixth street”
  • Happening now

    Sixth Street Reconstruction

    “Phase 1 construction is scheduled for 2026 and Phase 2 construction will occur in 2027.”

  • Happening now

    Tenth Line and Sixth Street Roundabout (County of Simcoe)

    “The County of Simcoe is constructing a single-lane roundabout”

    No date on the Town’s page.

  • Planned

    2026 Micro-Surfacing and Road Resurfacing

    “Works will include removing existing asphalt and hard surfaces from the street, minor base work, and resurfacing the roadway with new asphalt.”

  • Not firm yet

    Hurontario Street Reconstruction (Sixth Street to Cameron Street)

    “Construction is tentatively scheduled for 2028/2029, subject to Council approval.”

Copied word for word from the Town’s Construction Projects page, read 18 October 2026.

WHAT THE PAPERS SAY ABOUT “sixth street”

Those sentences are copied word for word out of the documents. Nothing here was written by a computer.

3 DOCUMENTS TO DIVE INTO
Show all 12 matches

Sixth Street Reconstruction (Town of Collingwood project page)

PDF page 1

improving overall canopy quality and resilience. Project News & Updates May 7, 2026: Temporary Road Closures and Transit Disruptions - Revised As part of the next phase of the Sixth Street Reconstruction Project, a temporary disruption will be in effect starting May 11, 2026. Below are details, including projected timelines, and impacts to transit service. The intersection…

Read it yourselfOriginal document

Housing Needs Assessment (2023)

PDF page 13

Affordability by Ownership Income Deciles  As per the PPS, Affordable Ownership Housing is defined as the least expensive of:  Housing that is affordable for those below the 6th income decile or housing which is 10% below the average resale home. Bill 23 has revised this to housing which equates to 80% of the average resale home price.  As reported by The Lakelands Association of Realtors, the…

Read it yourselfOriginal document

Construction Projects (Town of Collingwood, read 18 October 2026)

PDF page 1

…n the west side of Collingwood is part of this project as well. Active Transportation facilities were evaluated as part of the design, and one (1) way cycle tracks will be constructed on each side of Sixth Street from Hurontario to High Street. Construction will be in two (2) phases: Phase 1 Hurontario Street to Oak Street, and Phase 2 Oak Street to High Street. Phase 1 construction is scheduled f…

Read it yourselfOriginal document

Zoning By-law 2010-040 (consolidated November 2025)

PDF page 184

Collingwood Zoning By-law • Storage, concealed outside, and • Storage, outside display and sales. A minimum 6.0 m landscape strip is required abutting all street lines except Poplar Sideroad, Raglan Street or the Sixth Line where a 9.0 m strip is required. The landscaping strip may be interrupted by entrances. INDUSTRIAL PARK EXCEPTION TWO – M5-2 ZONE T…

Read it yourselfOriginal document

BIG QUESTIONS PEOPLE ASK

Three questions
the documents
already answer.

I wrote these three by hand, straight out of the papers — no computer wrote them. The box above searches all 2,158 bits of those papers.

How tall should downtown be?

What the Town’s own papers say

  • Most downtown heritage district lots are zoned C1, which allows up to 12 m, about 3 to 4 storeys Downtown Plan p.26.2 Downtown Plan p.26.
  • The new Official Plan says the general maximum height is 6 storeys or 20 m, with step-backs above the 3rd storey on key streets Official Plan p.89.1.
  • The Downtown Master Plan says there are "conflicting opinions on growth and height", plus too little affordable housing downtown and a weak link between downtown and the waterfront Downtown Plan p.14.
  • Its first action item is a study of where more height could work downtown, with a heritage architect on the team Downtown Plan p.26 Downtown Plan p.26.2.

People who want to build more say

The plan already allows 6 storeys, but the zoning still says 12 m. That gap scares off builders. Fix the zoning so apartments above shops can be built downtown, near jobs and transit.

People who want to go slower say

Downtown is a heritage district, and that is why people come. Height should follow the heritage study, protect views like the one to Town Hall, and use step-backs so the street still feels low Downtown Plan p.26.2 Official Plan p.89.1.

A fair way through

Both sides agree the rules don't match each other right now.

  • Commercial / mixed use: Finish the downtown height study first. Then update zoning so it matches the plan. Keep 3 storeys at the street, with taller parts stepped back.
  • Residential: Allow homes above shops, so there are more downtown homes without tearing down heritage buildings.
  • Industrial: No change needed.
  • Still unknown: The study's timeline and results. (Not in our sources.)

The Build and Protect columns are arguments. The cited sentences above are the part that comes from a document.

ASK A QUESTION

Ask it
like you would
ask a neighbour.

Type a question in your own words. You get three answers: someone arguing to build more, someone arguing to go slower, and then a plain summary of what makes sense — split into homes, shops and jobs. Every fact links back to the page it came from.

One question goes to three readers of the same passages: a case for building, a case for holding back, and a plain-language recommendation. It usually takes under a minute.

WHERE THIS COMES FROM

Where this comes from.

Town of Collingwood, Simcoe County and Province of Ontario public documents. Page numbers are PDF pages, not the number printed on the page. An excerpt is a short capture of a report whose full file could not be downloaded, and the link still goes to the original.

Show all 20 documents
TELL JONDONATE